Just hit 1,000 square feet of LVP in a single day by myself
I was laying down this rigid core stuff in a big open condo downtown, no transitions, just a clean rectangle. I started at 6 AM, had my jigsaw and tapping block ready, and just got into a rhythm. I didn't even stop for lunch, just kept clicking and locking. When I cleaned up and did the math, it was over a grand. I've been doing this for 15 years and always thought 700 was a solid, hard day. This stuff just flies if the subfloor is perfect and you don't have to mess around. Makes me wonder if I've been too slow on other jobs. What's the most square footage you guys have ever put down in one shift on a straightforward install?