Last month I decided to retile my half bathroom in my house on 118 Avenue and thought I had it all figured out after watching a few videos. Three days later the grout cracked and two tiles popped loose because I forgot to level the subfloor properly before starting. Has anyone else here learned the hard way that skipping prep work just doubles your costs in the end?
A half bathroom or not, when the toilet goes it's a mess no matter what. We had ours back up once and it flooded into the hallway, water everywhere. The cleanup and fixing the floor took way longer than I expected. So yeah, just a half bath but still a whole headache.