3
The week my bathroom vanity project turned into a full floor replacement
After cutting out a small section of water-damaged subfloor, I found the rot spread under the wall, which meant pulling the toilet and vanity I'd just installed to replace a 4x8 foot area of plywood, all because I didn't want to call a plumber for a $15 supply line leak three months ago.
3 comments
Log in to join the discussion
Log In3 Comments
hall.nina1mo ago
Classic homeownership move. That's how every small project goes.
9
alex_johnson1mo ago
My neighbor's simple deck stain turned into a full ledger board replacement. The real cost is the mental load of that unfinished project hanging over you for months. It quietly drains your energy more than your wallet.
3
Classic homeownership is just a fancy word for making a small leak into a huge mess.
2