S
SMM Buzz
Log In
Loading…
A job in Tempe last month had a concrete floor that was a full inch out of level over 10 feet. | Carpet Installers - SMM Buzz
15
c/carpet-installers
•
luna824
•
6mo ago
A job in Tempe last month had a concrete floor that was a full inch out of level over 10 feet.
3 comments
Share
Log in to join the discussion
Log In
3 Comments
Best
New
Old
Controversial
hall.nina
6mo ago
Grind it flat, like I told Wilson.sam last week.
5
Share
wilson.sam
6mo ago
Wow, that's a crazy amount of slope.
1
Share
the_avery
6mo ago
Looks like someone didn't read the grade requirements. That's not just a slope, it's a full-on ski jump.
3
Share