S
10

I finally started using a story stick on site last month

Had a client who kept changing measurements every time I showed up, and I was getting tired of running back to the shop. An old timer told me to just mark everything directly on a stick instead of writing numbers down, and it saved me like three trips on that job alone. Anyone else work off story sticks or do you just trust your tape?
3 comments

Log in to join the discussion

Log In
3 Comments
seth683
seth68315d ago
Man that is exactly the kind of hack that saves your whole week. I had a similar situation with a set of stairs where the homeowner kept tweaking the rise on me. Grabbed a furring strip and marked every single step direct on site. Never woulda caught those tiny changes with just numbers on paper.
1
the_hayden
the_hayden15d ago
Buddy of mine had a customer keep changing the countertop overhang while he was installing cabinets. He just marked the measurements on a scrap 2x4 with a Sharpie and held it up every time they changed their mind. Saved him from remeasuring three times.
5
terry_jones
Can't believe they kept changing it that many times, did he ever lose his cool?
1