That job site in Austin where the GC told me to "just make it work" with the dodgy foundation slab
Spent 4 hours last Tuesday shimming every damn course on that uneven pour because nobody wanted to tear it out, how do you guys handle contractors who rush the prep work?
2 comments
Log in to join the discussion
Log In2 Comments
johnson.jason2d ago
That 4 hour shim job sounds brutal. I had a similar slab in San Antonio last spring where the front corner was a full 1 1/4 inches low across a 12 foot span and the GC just said "throw some mud under it". Four of us spent half a day trying to get the first course level before the wall ties would even reach.
1
grace_allen2d ago
Kind of like how every house built after 2005 has that one corner where the drywall tape is cracking, right @johnson.jason? It's always the same story: someone skipped the prep work and now you're fighting the building's own bad decisions. That 1 1/4 inch drop is just the foundation trying to tell you it was poured on a Tuesday afternoon. It's amazing how often the simple fix gets turned into a whole ordeal because nobody wanted to spend the extra thirty minutes doing it right the first time.
5