Warning: my first tube sheet looked like a blind man laid it out, then 6 weeks later it passed
Six weeks ago my tube sheet layout on a small boiler job in Peoria was off by about 3/16 at the far edge, and the roller guy gave me a look I won't forget. I went back to basics, marked my centerlines twice, and built a simple wooden trammel instead of trusting my tape for the long pulls. Last Friday the same fitter checked it with a pin gauge and it slid through clean on the first try. Feels good when a fix actually sticks instead of just getting lucky once. What are you all using to keep long layouts square without dragging out the laser every time?
The roller guy gave you a look you won't forget, oh man I felt that through the screen. Six weeks of eating that and then the pin gauge slides clean first try? That's the good stuff right there.