Heard a guy in Wichita say he never rolls a tube dry, and now I'm second guessing my whole weld prep
He said a dry roll on a 2 inch header pulled grit into the joint and cost him a redo on a pressure test last spring. Do you all lube the tube before rolling or is he just being picky?