Guy at the lumberyard in Boise mentioned he leaves his deck boards out in the sun for a week before screwing them down
I was picking up a load of 5/4 boards last month and the guy helping me load talked about how he never installs decking straight off the stack. He said he lays it flat out in the yard for 5 to 7 days, flips them once around day 3, and lets them dry out and shrink before he touches a screw. I tried it on a 12 by 16 platform out back and only had 2 boards cup on me instead of the usual mess. The gaps stayed even too, which never happens when I rush it. The catch is you need the space to spread everything out and you're stuck waiting. Anyone else do a dry-out window like this, or do you just screw them down and hope for the best?