S
20
c/alarm-system-installersjosephbutlerjosephbutler14d agoMost Upvoted

Finally wired up a panel in under 2 hours at a Northside church

I was at the old Methodist church on Elm Street last Tuesday, running wires for their new security system. Got the whole panel punched down and tested in about 1 hour 45 minutes, which is way faster than my usual 3 hours. What do you do to speed up your terminal work on those bigger panels?
2 comments

Log in to join the discussion

Log In
2 Comments
king.wyatt
king.wyatt14d ago
Wired up a panel in under 2 hours" is impressive, especially at a church where you probably have to work around their schedule. I've found that pre-labeling all my wires with a label maker before I even start running them saves me a ton of time on the punch down side. Also, keeping a good impact tool with a sharp blade makes the terminations cleaner and faster so you don't have to redo anything.
1
emma_clark
emma_clark13d ago
Fr @king.wyatt, pre-labeling is a game changer. I do the same thing, saves so much headache later.
2